世博公园——“扇面上的水墨画”
[日期:2010-05-11] 来源:《中外景观》 作者:
发表评论(0)
打印
6、消隐的防汛墙 Blanking of the flood prevention wall
防汛墙结合地形变化按城市防洪要求将基地设置为四个层次,除了20年、100年、千年一遇外另外加设滨水台地,按统一的设计方式进行梯地跌落,对台地进行艺术化的处理消除垂直驳岸,在保证人流的安全的前提下应让人观赏和感受到黄浦江是一条一日两变的潮汐河。
6. In conformity to the flood control standards, the flooding walls are built with different dimensions, depending the time they are supposed to stand against floods – 20 years, 100 years or 1000years. In according to the design, at the top of the floodwalls will be constructed a waterfront platform. The four levels terrace ensures visitor to admire the tidal changes of the Huangpu River twice a day, without any worries about their safety.
点击查看更多世博新闻
专题:2010年上海世博会